Pouring And Stripping

I stripped the first wall pour today. A few voids, but those are easy to sack and patch. Can’t wait to get this baby painted and backfilled.

This morning’s pour. This is the upper end of the retainer wall. 8-1/2 cubic yards of concrete.

Here’s the Astro Table, which I stripped Wednesday. I’ll have to dig a 70′ conduit trench before I can hook up the electrical. I’ll probably paint it same color as the house.

Advertisements


All comments are welcome.

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s